Skip to main content
Civic Worth
Open menu

Civic Worth is in beta. It’s assembled automatically from public records and can be wrong. Check the official source before you rely on it, and tell us what’s wrong, or see what we’ve corrected.

Development pulse: building permits by neighborhood

Where is construction money flowing? Search your address to see how your area compares — or click any neighborhood on the map. Switch scope and year, or see where permitting accelerated the most.

Year:
Full ranking — all 40 neighborhoods
RankNeighborhoodpermits per 1,000 parcels
1Fort Hayes824
2Wolfe Park500
3Airport459
4Dublin Road Corridor302
5State of Ohio250
6Downtown220
7German Village196
8Clintonville195
9Livingston Avenue Area176
10Victorian Village160
11Near East150
12Far North147
13South East141
14West Scioto136
15Far West131
16Franklinton130
17Far South129
18Brewery District127
19Far Northwest126
20South Side123
21Fifth by Northwest121
22Mid East120
23Southwest116
24University District115
25Olentangy West110
26Italian Village109
27Northwest107
28Northland104
29Far East102
30Westland100
31Rocky Fork-Blacklick98.1
32Northeast97.0
33South Linden96.8
34Greater Hilltop94.3
35North Linden92.4
36East Columbus86.1
37North Central78.7
38Hayden Run78.4
39Harrison West78.1
40Milo-Grogan61.8
—Harmon Road Corridorinsufficient data

How to read this map

Permits per 1,000 parcels is the default so the map isn’t just a picture of neighborhood size — a small neighborhood with lots of building activity should stand out. Use the raw-count toggle if you want absolute volume. New construction is the “New structure” permit types; Commercial is the commercial-occupancy permits.

The city records only the year a permit was issued, not the day — so this map works year by year. 2026 is year-to-date (marked YTD), so it will read lower than a full year; that’s why the default view is 2025, the latest complete year. The Growth ’24→’25 view compares two complete years — where permitting sped up (positive) or cooled (negative) — a truer read of momentum than any single year, and not distorted by the partial 2026.

Source: City of Columbus building permits (city open data), refreshed nightly.Neighborhood boundaries are the City of Columbus’s Columbus Communities planning areas (CC0, as of July 23, 2026). The City notes they aren’t a substitute for area commission boundaries. They include some land outside the city limits: township pockets and two small villages, Minerva Park and Valleyview. See methodology for boundary and suppression details. Neighborhoods with too few permits show as “insufficient data” rather than a noisy number.

Explained in